Construction Begins on 4th Floor of Briscoe Library

The former Drug Information Services office on the south side of the Briscoe Library’s 4th floor is undergoing remodeling. The space is being prepared as a suite of offices for several staff from the Office of Academic, Faculty, and Student Affairs who are responsible for institutional accreditation and effectiveness. The work will last about six weeks, through mid-August, and the workers will do their best to keep the noise to a minimum. The 4th floor is a designated Quiet Zone, where even a whisper is often met with a frown. It is understandable that construction noise may be bothersome to those who are expecting to hear a pin drop but not a hammer. Other floors of the building will continue to be available for study, and free earplugs are always available from the Circulation Desk.

Questions or comments may be directed to Jonquil Feldman, Director of Briscoe Library and Outreach Services, at feldman@uthscsa.edu.

 

Article Categories: Announcements, News from the Libraries